Nevada contractor license 0077896A · Advanced Design & Development, Inc.

Monday to Friday, 9:00 AM to 4:00 PM · 1155 Watson Way, Suite 7, Sparks, NV 89431

(775) 200-0648

We renovate the whole house under one contract.

Advanced Design And Development is a Northern Nevada general contractor. One scope, one schedule, one company answering the phone from the first walkthrough to the punch list.

Scope
Whole-home remodels, additions, ADUs, kitchens and baths, commercial build-outs
Where
Reno · Sparks · Carson City · Fernley · Incline Village · Verdi
Estimates
Free, written, line-item
Talk to us
(775) 200-0648, Monday to Friday, 9:00 AM to 4:00 PM
EXISTING STRUCTURE ADDITION
An elevation study drawn for this page, not a photograph of a finished job. Advanced Design And Development publishes only its own completed work; the photographs further down this page and on the projects page are ours, dated, and shot on our own sites. The drawing stays because it is what the early weeks of a job actually look like: a written scope, a set of studies, and a phone number that a person answers.

01What we take on

Everything between the drawings and the last inspection.

A remodel goes wrong in the gaps: between the designer and the framer, between the framer and the inspector, between what you picked and what got ordered. A general contractor is the party that owns those gaps. Here is what that means in practice.

01

Drawings before demolition

Dimensioned plans and elevations, a selections list with model numbers, and a line-item scope. You approve a drawing, not a description.

02

Permits and inspections

We pull the required permits, order materials, and schedule the work so trades hand off cleanly. We book the inspections and we meet the inspector.

03

One schedule for every trade

Demo, framing, mechanical, electrical, plumbing, drywall, tile, cabinets, finish carpentry and paint sit on one calendar we hold and publish.

04

Structural coordination

Load-bearing headers, the beams that carry the weight above an opening, are handled inside the scope along with shear walls and the engineering they need, not discovered by a framer on a Tuesday.

05

Selections and allowances tracked

Every allowance carries a running balance. An upgrade shows up as a number the day you choose it, not as a line on the final invoice.

06

The house you still live in

Dust walls, floor protection, which door the crew uses, where the dumpster sits, and how long the kitchen is out of service, all decided up front.

02Service lines

Eight lines of work, run by the same office.

The list below is not a menu of products. It is the range of scope one contract can cover, from a single bath to a second storey to a commercial suite handed back on a lease date.

01

Whole-home renovation

The full house on one contract: layout, structure, mechanical, finishes and exterior, sequenced so the trades never wait on each other.

02

Home additions

Rooms and second storeys added to houses that are already standing, tied into existing foundation, framing, roof line and mechanical.

03

ADUs and garage conversions

Accessory dwelling units and garage conversions. The City of Reno, the City of Sparks and unincorporated Washoe County each run their own rules; we work to the one your parcel sits in and confirm it before design starts.

04

Kitchens

Layout first, then structure, then the trades. Cabinet drawings, appliance rough dimensions and the electrical plan are settled before a single box is ordered.

05

Bathrooms

Waterproofing and substrate detailed before anyone picks a tile. Pan slope, membrane, backing and ventilation are the parts you never see and the parts that fail.

06

Outdoor living

Decks, patio covers, outdoor kitchens and the footings, drainage and attachment details that keep them off the house structurally.

07

Commercial tenant improvement

Build-outs and TI work priced against a lease date, phased around occupied neighbours, with after-hours work where the landlord requires it.

08

Exterior renovation

Roofline changes, porches, porticos and exterior stairs: the jobs where the shape of the outside changes. A window, siding or door swap on its own is not work we quote; inside a remodel we run, it stays on the one contract.

03How a project is sequenced

Six phases, and the artifact you hold at the end of each one.

Every phase below ends with something you can read, check and keep. That is the whole method: if a step cannot produce a document, it is not a step, it is a promise.

  1. 01

    Walkthrough

    Free estimate. We walk the property, confirm scope, and give you a written quote. We measure, photograph the conditions we can see, and tell you which parts of the house we cannot assess until something is opened up. You get a written, line-item estimate

  2. 02

    Design and selections

    Layout options, then dimensioned plans and elevations. Selections are made against named allowances with model numbers attached, so the budget and the drawings describe the same house. You get plans, elevations, a selections list

  3. 03

    Contract and permits

    A line-item scope with a draw schedule, the staged payments released as each milestone is reached rather than on a set date. We prepare and submit the permit set to the jurisdiction your address falls under, and we schedule the inspections the job will need. You get a signed contract and an issued permit

  4. 04

    Demolition and structure

    Protection goes in first: dust walls, floor cover, a defined crew path. Then demo, framing, headers and shear, followed by the mechanical, electrical and plumbing rough-in, the ducting, wire and pipe that go in before the walls close. Concealed conditions surface here, and they surface in writing. You get passed rough-in inspections

  5. 05

    Finishes

    Drywall, tile, cabinets, counters, finish carpentry, paint and fixtures, run against one schedule with a weekly look-ahead. If a date moves you hear it that day, along with what it moves downstream. You get a weekly schedule update

  6. 06

    Punch list and close-out

    We walk the job with you and write the punch list down rather than remembering it. Final inspection, then close-out: approved drawings, inspection record, manufacturer documentation for the products installed, and the final draw released after sign-off. You get a signed punch list and a close-out package

04Estimates and change orders

How the money is described before you spend any of it.

Most remodel disputes are not about workmanship. They are about a number that changed and a conversation nobody wrote down. These four mechanics are how we avoid that, and they are in the contract, not just on this page.

The estimate
Free, written, line by lineWe walk the property, confirm scope, and give you a written quote. Line items, not a lump sum, so you can see what a decision costs before you make it.
The draw schedule
Payments follow milestonesEach draw is tied to something you can look at (permit issued, framing complete, rough-in inspected, drywall closed), not to a date on a calendar. The final draw is released after the punch list is signed.
Allowances
A number you can watch moveTile, fixtures, appliances and lighting carry a stated allowance with a running balance. Choose above it and you see the difference the day you choose, in a document.
Change orders
Written, priced and signed firstA concealed condition, a scope change you request, an inspector requirement, or a selection over its allowance. Each one is priced as labor plus material plus a stated markup and signed before the work happens.

Third-party financing is available through Enhancify. Rates, terms and approval come from the lender, not from us. See Enhancify's terms.

05The work

The photographs on this site are of our own jobs, and nothing else is.

This website is new, and it is honest about that. We are not going to publish a year count, a project count or a customer count under this name before there is a record to point at. Those are exactly the numbers every contractor site prints and almost none of them source.

So there are no stock interiors on this site, no photographs of somebody else's kitchen, no five-star graphic, no review count and no award badge. What there is now is our own work, shot on our own sites by a photographer we hired or by us while the work was underway, with the date written underneath wherever we have it. Two plates are below and more are on the projects page; the written records (scope, numbers, the honest line about what we would do differently) take longer to earn and land there as they are written.

Until they do, judge us on the two things you can actually check before you sign: whether the estimate is specific, and whether the person on the phone can describe your job in the right order.

Ask for a walkthrough

Wall-section study, drawn for this page. An illustration, not a project photograph. The distinction matters, and a contractor who blurs it on their own website will blur it on your invoice.
A worker in a tan jacket carrying a new white window unit up the front steps of a house
7 March 2025: the replacement unit going in through the front door on one of our own jobs.
Close view of painted vertical board-and-batten siding with the shadow of a branch across it
A different job, 28 October 2025: the wall we leave behind, close up.

06Where we hold contracts

Six communities, close enough to run a schedule properly.

A general contractor's service area is not a marketing radius, it is how far a superintendent can drive twice in a day when a trade has a question. Ours is Reno, Sparks and the towns along the roads out of them.

  • RenoMid-century ranches, Old Southwest and Northwest infill, and hillside lots where access dictates the sequence more than the drawings do.
  • SparksPost-1990 subdivisions with repeatable framing, plus older Victorian-district stock where a remodel is really a structural project.
  • Carson CityA separate jurisdiction with its own review desk. Permit timelines and inspection scheduling differ from Washoe, and we plan for it.
  • FernleyIts own city building department inside Lyon County, with the county reviewing the parcels just outside the line, so the parcel decides which counter.
  • Incline VillageUnincorporated Washoe County inside the Tahoe basin, so the county and the Tahoe Regional Planning Agency both review the work.
  • VerdiWildland-interface detailing and winter access, both of which change what a schedule can honestly promise between November and March.

Address not on the list? Call (775) 200-0648. If a job is outside the distance where we can supervise it properly, we will say so rather than take it.

07Questions we get asked

The eight questions worth asking any contractor.

Answers below are the same ones we give on the phone. Ask the next contractor you talk to the same eight and compare how specific the answers get.

08Start a conversation

Tell us the house and the scope. We will tell you the order it has to happen in.

The first conversation is not a sales call. It is us finding out whether the job you are describing is a job we should be running, and you finding out whether we can describe it back to you in the right sequence.

Fastest way to reach us (775) 200-0648

Monday to Friday, 9:00 AM to 4:00 PM. A person answers, and it is somebody who has been on a job site. The form goes to the same place, one business day behind the phone.

Optional. The phone is the faster path, since email replies can take a business day.
Rooms, rough square footage, whether walls move, and when you would like to start. Detail here shortens the first call.

By clicking Request a walkthrough, you authorize Advanced Design & Development, Inc. (Nevada contractor license 0077896A), and no other company, to contact you at the telephone number and email address you entered above, by telephone call and email, including calls delivered using an automatic telephone dialing system or an artificial or prerecorded voice, about the project you are asking us about on adadremodel.com. You are not required to agree to this in order to buy any product or service from us. See our Privacy Policy and Terms and Conditions.