Nevada contractor license 0077896A · Advanced Design & Development, Inc.

Monday to Friday, 9:00 AM to 4:00 PM · 1155 Watson Way, Suite 7, Sparks, NV 89431

(775) 200-0648

An addition, an ADU or a bearing wall coming out pulls a Sparks permit. Our shop is three miles from the counter that issues it.

Our shop is on Watson Way, which makes Sparks the one city in the footprint we can be in twice in a day without planning it. We contract whole-home remodels, kitchens and baths, additions, ADUs and exterior renovation here.

Jurisdiction
City of Sparks: Building and Safety
Permit counter
431 Prater Way, Sparks · Accela portal
Also covered here
Spanish Springs, up the Pyramid corridor
Talk to us
(775) 200-0648, Monday to Friday, 9:00 AM to 4:00 PM

01The exempt list, and what is not on it

What Sparks Building and Safety exempts, and the remodel work it does not.

Sparks publishes an exempt-work list, and two lines on it matter for a house. It names “Replacing existing residential doors and windows” flatly, with no conditions attached, and it names “Replacing stucco or drywall if less than 100 sq. ft.” Those are single-trade questions, not remodel questions. A window, siding or door job on its own is not work we quote.

Nothing we contract on this page is on that list. An addition, a second storey, an ADU, a garage conversion, a patio cover, a deck above 30 inches, a bearing wall coming out between a kitchen and a dining room: all of it is permit work at Building and Safety, plan review first and inspections after. One street over, inside Reno city limits, the exempt list is a different document, and in unincorporated Washoe County it is different again. So the practical Sparks question is not whether the job pulls a permit but which counter, in what format and in what order, and we tell you that during the walkthrough rather than after the contract.

02The 1960s ranch belt

Remodeling a 1960s Prater Way ranch: the framing was built for the house that was there.

The 1950s-to-1970s tract along Prater Way, Pyramid Way and Sparks Boulevard was built light: hardboard and T1-11 over sheathing, ceiling joists bearing on the wall between the kitchen and the dining room, a band joist that was never asked to carry a deck. A remodel in one of those houses is not a finish job with a square-foot price. It is a structural job with a finish schedule attached, and the structure is the part that decides the number.

The sequence we hold to: open up before we commit, so we can see what the wall is actually doing; size the header and carry the bearing down to something that can take it, with an engineer’s stamp where the wall does shear work for the elevation; then rough-in (the pipe, wire and duct that go in before the walls close), insulation, drywall and finish in that order, each behind its inspection. The parts that fail are the parts nobody can see afterwards, which is exactly why they are written into the scope, the list of work the contract actually covers, with their hold points named.

03Structure

Additions, ADUs and patio covers under one contract.

The 1995 to 2008 subdivisions that make up most of Sparks’ housing volume were built with repeatable framing, so the addition you want is usually straightforward once the roof tie-in is drawn properly. The older railroad-town fabric around Victorian Square and B Street is the opposite: small wood-frame stock where an addition is a structural project with a finish schedule attached. A detached ADU on either kind of lot is its own small building, with its own footing, its own roof and its own utility runs back to the house or the street.

Either way the work crosses trades: footing, framing, roof tie-in, mechanical, electrical, plumbing, insulation, drywall, finish and exterior. That is a permit set, a plan review, a string of inspections and six or seven trades on one schedule, which is exactly the job a general contractor exists to carry. Patio covers and decks land here too, and attachment is the part that matters: a ledger fastened through cladding into nothing is the most common defect we get called to fix.

04Scope

What we take on in Sparks.

The shop is here, which means a superintendent can be at most Sparks addresses twice in a day. Four kinds of job.

02

Additions, ADUs and roof tie-ins

Rooms, second storeys and ADUs on 1990s and 2000s tract framing, and on the small wood-frame stock in the old town.

03

Whole-home renovation

Interior layout, structure, mechanical and exterior on one schedule, phased around a household still living there.

04

Decks and patio covers

Footings, ledger attachment and drainage detailed so the structure stays off the house it is bolted to.

More on three of them: whole-home renovation, decks and patio covers and exterior renovation.

05Permit, inspection, sign-off

Same office hours as ours, three miles from the shop.

Sparks Building and Safety runs a 9:00 to 4:00 counter on Prater Way, Monday to Friday (the city’s Building Permits page, read 24 September 2026), and takes submittals through Accela. We keep the same hours, which turns out to matter: a question raised at 9:15 gets answered the same morning.

We prepare the permit set, submit it, answer plan-review comments ourselves and book every inspection against the trade calendar. Where the scope really is on the exempt list we say so, and we do not invoice for a permit nobody needs. At close-out you get the approved drawings, the inspection record and the manufacturer documentation; the final draw follows the signed punch list.

06Up the Pyramid corridor

Spanish Springs.

Spanish Springs is unincorporated Washoe County up the Pyramid Highway, and most of it went up between 1995 and 2008, a cohort old enough that whole streets come due for the same work in the same few years.

Two things follow for scope. An addition, an ADU, a patio cover or a deck on a Spanish Springs parcel goes through Washoe County Planning and Building at 1001 East 9th Street, not the Sparks counter three miles from our shop. And an architectural committee usually reviews the elevation before material is ordered, on a meeting calendar rather than a processing queue. We put the committee packet in first, because it is the approval most likely to sit for a month while everything else waits on it.

07Questions

Four questions we get from Sparks homeowners.

Contracts, draws and change orders are answered on the home page. These are about Sparks.

08Start a conversation

Tell us the scope. We will tell you what it pulls at Prater Way.

Most of the value in the first call is establishing what the job pulls at Building and Safety and which approval has to land first, because that moves the schedule more than any material decision will.

Fastest way to reach us (775) 200-0648

Monday to Friday, 9:00 AM to 4:00 PM. A person answers, and it is somebody who has been on a job site. The form goes to the same place, one business day behind the phone.

Optional. The phone is the faster path, since email replies can take a business day.
Rooms, rough square footage, whether walls move, and when you would like to start. Detail here shortens the first call.

By clicking Request a walkthrough, you authorize Advanced Design & Development, Inc. (Nevada contractor license 0077896A), and no other company, to contact you at the telephone number and email address you entered above, by telephone call and email, including calls delivered using an automatic telephone dialing system or an artificial or prerecorded voice, about the project you are asking us about on adadremodel.com. You are not required to agree to this in order to buy any product or service from us. See our Privacy Policy and Terms and Conditions.