We deliver tenant improvements and commercial build-outs.

A build-out runs against a lease, not a mood board. The work letter, the building’s own rules and a rent commencement date are the constraints. The schedule is the deliverable.

Scope
Office, retail, medical, restaurant and light-industrial build-outs and refits
Where
Reno, Sparks, Carson City and the county towns
Read first
The lease, the work letter and the building standards, before we price it
Permits
We prepare the set, submit it, and meet the inspector
Talk to us
(775) 200-0648, Monday to Friday, 9:00 AM to 4:00 PM

01What a build-out actually is

Half the scope is already written, and it is not written by you.

Before a plan is drawn, three documents decide most of the job. The delivery condition says what the landlord hands over: a bare shell with a slab and a deck above it, a space someone else left behind, or something between. The work letter splits the scope: what the landlord builds, what you build, and what the landlord contributes toward it. The building standards say which ceiling, which door, which lighting and which control system you are allowed to use, whatever you had in mind.

We read all three before we price anything, because a bid drawn against the wrong split is not a bid, it is a future argument. What comes out of that reading is a scope document written in the same terms as your lease: line items, allowances, exclusions, and the items that belong to the landlord. When your lease, our contract and the drawings describe the same build-out, the rest of the job is execution.

02Somebody else’s building

The neighbours stay open, and the building has rules about you.

Most tenant improvements happen inside a building that is still running. There are hours when noisy work is allowed and hours when it is not. There is one freight route, one elevator, and a loading window somebody else also booked. There is a property manager who wants to know which crews are on site, and a life-safety system that cannot simply be switched off because a duct is in the way.

Those constraints are not obstacles to be discovered week by week. They are inputs to the schedule, collected during pre-construction and written into it: which trades work after hours, where dust separation goes, how the corridor gets protected, and who tells the tenant next door before the loud day rather than during it. Where your own business has to keep trading through the work, the build gets phased so there is always a usable, exit-served part of the space, and you know on day one which weeks are the difficult ones.

03The sequence

Eight phases, and the artifact you hold at the end of each one.

A build-out has two approval chains, the landlord’s and the jurisdiction’s. They run at different speeds.

  1. 01

    Lease, work letter and site walk

    We read the documents, walk the space with them in hand, and record what is actually there against what the delivery condition claims. You get a scope split and an exclusions list

  2. 02

    Test fit and programme

    Headcount, workflow, storage and front- and back-of-house laid onto the real column grid and the real exits, so the plan fits the building rather than the brochure. You get a dimensioned test fit

  3. 03

    Design and construction documents

    Partitions, ceilings, mechanical, electrical, plumbing, data and finishes coordinated into one set, with accessibility resolved on the drawing. You get a coordinated permit set

  4. 04

    Landlord approval and permit submittal

    The set goes to the landlord and to the reviewing department in parallel, because running those two waits in series is how a rent commencement date gets missed. You get a landlord approval and an issued permit

  5. 05

    Contract, long leads and mobilisation

    A line-item contract with draws tied to milestones, long-lead equipment released, and the building’s access and hours agreed before a crew arrives. You get a signed contract and a dated schedule

  6. 06

    Demolition and rough-in

    Protection and dust separation first, then demolition, then framing, mechanical, electrical, plumbing, fire protection and low voltage, inspected before anything is closed. You get passed rough-in inspections

  7. 07

    Ceilings, finishes and fixtures

    Drywall, ceilings, flooring, millwork, glazing, paint and casework, sequenced so no trade is working over a finished surface. You get a finished, cleaned space

  8. 08

    Sign-off, punch and handover

    Final inspections and whatever occupancy sign-off the jurisdiction requires, then a walk-through with the landlord and with you. You get a signed punch list and a close-out package

04Above the ceiling

Tenant improvements go wrong in the space between the ceiling and the deck.

Duct, sprinkler branch lines, structure, conduit, data trays and the tops of partitions all want the same few inches, and none of them are drawn by the same person. Coordinate that zone on paper and the ceiling goes in once. Skip it and a partition gets built, a duct arrives, the duct wins, and the partition comes down.

The other decision made up there is which partitions run to the structure above and which stop at the ceiling: a question about sound, smoke and what the drawings require, not about how much drywall anybody wants to hang.

Ask for a pre-construction review

Above-ceiling coordination study, drawn for this page. An illustration, not a project photograph. We do not have completed build-outs of our own to show yet, and we are not going to borrow somebody else’s.

05What goes wrong

Six ways a build-out slips, and where the control sits.

01

The two approval chains ran in series

Landlord review finished, then plan check started, and the two waits added up instead of overlapping. Control: both are released in the same week, on one schedule.

02

The work letter was never reconciled

Two documents describe the same scope differently and nobody compared them until an invoice arrived. Control: the split is written down before pricing is issued.

03

Long-lead equipment released late

Switchgear, rooftop units, storefront glazing and custom millwork run on their own calendars. Control: the schedule is built backwards from the longest lead.

04

The existing space was not what the drawings said

An as-built that was never as built: a beam, a shaft, an abandoned line. Control: an existing-conditions survey before design, and a written provision for what turns up later.

05

Accessibility solved on site

Clearances, routes and restroom layouts fixed with a tape measure after framing is up. Control: resolve them in design, when the fix is a line rather than a wall.

06

Nobody owned the building’s rules

Work hours, freight access and notice requirements discovered a trade at a time. Control: collected in pre-construction and written into the schedule.

06Schedule and money

The date on the lease is the only deadline that matters.

Every commercial build-out is scheduled backwards from a date somebody already signed. We take that date, subtract the approvals, the plan check, the long-lead releases and the inspection sequence, and show you where the start actually has to be. That includes the case where it has already passed, which is worth knowing in the first week rather than the ninth.

The money follows the same logic. Draws are tied to milestones you can look at, and where the landlord is contributing an improvement allowance our draw schedule is written to line up with how that allowance is disbursed under your lease. Changes are priced and signed before the work happens, with the reason recorded, because on a leased space it matters later who asked for it. We publish no square-foot figures: build-out cost is driven by delivery condition, mechanical scope and finish level, and a number that ignores all three is a guess with a decimal point.

07Questions

Three questions tenants ask before a build-out starts.

Contracts, draws and change orders in general are answered on the services overview. These are about leased space.

09Start a conversation

Send us the lease and the space. We will send back the schedule it implies.

The first conversation is not a sales call. It is us reading the delivery condition, the work letter and your date, and telling you what has to happen in what order to reach it.

Fastest way to reach us (775) 200-0648

Monday to Friday, 9:00 AM to 4:00 PM. A person answers, and it is somebody who has been on a job site. The form goes to the same place, one business day behind the phone.

Optional. The phone is the faster path, since email replies can take a business day.
Approximate square footage, the use (office, retail, medical, restaurant, shop), the delivery condition if you know it, and the date on the lease. Detail here shortens the first call.

By clicking Send us the space, you authorize Advanced Design & Development, Inc. (Nevada contractor license 0077896A), and no other company, to contact you at the telephone number and email address you entered above, by telephone call and email, including calls delivered using an automatic telephone dialing system or an artificial or prerecorded voice, about the project you are asking us about on adadremodel.com. You are not required to agree to this in order to buy any product or service from us. See our Privacy Policy and Terms and Conditions.