Six phases, one contract: how an Advanced Design And Development remodel actually runs.

A remodel is not one job. It is six jobs handed to each other, and almost every failure is a bad handoff. Here is the order we work in and what you hold at the end of each step.

Phases
Six, walkthrough to close-out
Contract
One line-item scope listing what gets built, one draw schedule releasing payment at milestones
Permits
Prepared, submitted and inspected by us
Talk to us
(775) 200-0648, Monday to Friday, 9:00 AM to 4:00 PM

01Why the order matters

The expensive mistakes are made in the first three weeks, on paper.

Manage a remodel yourself and you sign separate agreements with a designer, a framer, an electrician, a plumber, a tile setter and a cabinet shop. Then you become the only person who knows what all six agreed to. Nobody in that arrangement owns the seams. When the electrician roughs in to a plan the cabinet shop has already revised, the argument is between two contracts and you are holding both.

Design-build removes the seam by removing the second contract: one party draws it, prices it, permits it, builds it, and eats its own coordination errors. It also moves decisions earlier. An hour spent settling a layout on a drawing is an hour not spent settling it with a framer standing in the room, and the price gap between those two conversations is the whole argument. The sequence below is front-loaded on purpose: the first three phases show no visible progress and decide whether the last three go well.

02The six phases

Each phase ends in a document, and the next one does not start without it.

Read the right-hand line on each row first. If a step cannot hand you something you can keep, it is not a step: it is a promise.

  1. 01

    Walkthrough and written estimate

    Free estimate. We walk the property, confirm scope, and give you a written quote. We measure, photograph what we can see, and name what we cannot: a finished wall is a stated unknown at this stage, not a silent one. Line items rather than a lump sum, so the cost of a decision is visible before you make it. You get a written, line-item estimate

  2. 02

    Design and selections

    Layout options first, then dimensioned plans and elevations. Selections run in parallel against named allowances with model numbers attached. A drawing that does not know which range it is drawn around gets redrawn later. How this phase is billed is written into the design agreement before drawings start. You get plans, elevations, a selections list

  3. 03

    Contract and permits

    A line-item scope with a draw schedule tied to milestones, not to dates. We prepare the permit set and submit it to the jurisdiction your address actually falls under (Reno, Sparks and unincorporated Washoe County each run their own review), then answer the review comments ourselves and book the inspections. You get a signed contract and an issued permit

  4. 04

    Demolition and structure

    Protection goes in before anything comes out: dust walls, floor cover, a defined crew path, a decided place for the dumpster. Then demo, framing, headers and shear, then the mechanical, electrical and plumbing rough-in, the ducting, wire and pipe that go in before the walls close. Concealed conditions surface here, and the rule is they surface in writing and get priced before anyone builds past them. You get passed rough-in inspections

  5. 05

    Finishes

    Drywall, tile, cabinets, counters, finish carpentry, paint and fixtures. The order is fixed by what has to cure, what has to be measured off installed work, and what cannot be walked on afterwards. We hold one schedule for every trade and publish a weekly look-ahead; if a date moves you hear it that day. You get a weekly schedule update

  6. 06

    Punch list and close-out

    We walk the job with you and write the punch list down rather than remembering it, then work it to completion. Final inspection, then close-out: approved drawings, the inspection record, and manufacturer documentation for what was installed. The final draw releases after you sign the list off, which is the point of holding it back. You get a signed punch list and a close-out package

03Who decides what

Four things that are yours, and four that are ours.

Most friction in a remodel is not disagreement. It is two people who each assumed the other owned a decision.

Yours
Scope and selectionsWhat the house should do when it is finished, and which products go in it. We price the choice and its schedule effect; the choice stays yours.
Yours
Approving each phaseDrawings, allowances and change orders are signed before the next phase begins. Nothing proceeds on a nod in a hallway.
Ours
Sequence and tradesWhich trade is on site on which day, and what has to be finished before the next one is allowed to start.
Ours
Code and inspectionsThe permit set, the review comments, the bookings, and being the person who meets the inspector at the house.

04The schedule as a document

A schedule is only real if it can be wrong out loud.

A bar chart nobody updates is decoration. Ours exists so a slip has somewhere to show up: when framing runs a day long, the look-ahead moves and you can see which trade it pushed and what it did to the finish date.

What we will not do is publish a calendar duration on a website. The honest range for a whole-home scope turns on the permit path, the age of the house and how fast selections land; the duration we quote is set per project after the walkthrough and written into your schedule, not onto this page. A number invented for a web page is the first date a client holds you to and the first one you miss.

  • 01
  • 02
  • 03
  • 04
  • 05
  • 06
Schedule study drawn for this page. An illustration of how the six phases overlap, not a real project’s dates. Yours is built from your permit path and your selections, and it is issued to you rather than described.
Seen from indoors, a worker in gloves holding a new window unit up against the head jamb of the opening
The middle of the sequence, photographed: a new unit held to the head jamb before anything is fixed. 7 March 2025, one of our own jobs.
A worker indoors checking the top of a newly installed double-hung sash
And the part that never makes the schedule: the sash is worked by hand at every opening before anyone moves on.

05Questions about the process

Four things people ask once they have read the sequence.

Contracts, draws and change orders are answered on the questions page. These four are about the order of work.

06Start a conversation

Describe the house. We will tell you which phase you are actually in.

Most people call us somewhere in the middle of phase one and think they are in phase four. That is normal, and sorting it out on the phone costs nothing.

Fastest way to reach us (775) 200-0648

Monday to Friday, 9:00 AM to 4:00 PM. A person answers, and it is somebody who has been on a job site. The form goes to the same place, one business day behind the phone.

Optional. The phone is the faster path, since email replies can take a business day.
Rooms, rough square footage, whether walls move, and when you would like to start. Detail here shortens the first call.

By clicking Request a walkthrough, you authorize Advanced Design & Development, Inc. (Nevada contractor license 0077896A), and no other company, to contact you at the telephone number and email address you entered above, by telephone call and email, including calls delivered using an automatic telephone dialing system or an artificial or prerecorded voice, about the project you are asking us about on adadremodel.com. You are not required to agree to this in order to buy any product or service from us. See our Privacy Policy and Terms and Conditions.