Nevada contractor license 0077896A · Advanced Design & Development, Inc.

Monday to Friday, 9:00 AM to 4:00 PM · 1155 Watson Way, Suite 7, Sparks, NV 89431

(775) 200-0648

We write down what we learn planning Reno remodels.

Seventeen guides on contracts, money, permits and living in a house that is being taken apart. All seventeen are written and posted. The list below is the whole library, in the order we would read it.

Published so far
Seventeen entries, published 6 October 2026
Subject
Contracts, budgets, permits, site life
Not covered here
Product round-ups and buying guides
Faster than reading
(775) 200-0648, Monday to Friday, 9:00 AM to 4:00 PM

01Why this page exists

The expensive surprises in a remodel are contractual, not decorative.

Almost nobody signs a construction contract twice. The result is that a homeowner meets the mechanics of the thing for the first time while it is already happening to them, and usually while somebody is asking them to approve something in the next twenty minutes. Those mechanics are allowances, plan review, the week the kitchen is a folding table in the garage, draw schedules, the staged payments released as the work is finished, and change orders, the written price and schedule change signed before the extra work starts.

Advanced Design And Development spends most of its planning time explaining those mechanics on somebody’s kitchen counter. Writing them down once, in the order they actually arrive, is cheaper for everybody than explaining them eight times a month. So this library is deliberately narrow: it covers how a job is bought, priced, permitted and lived through. It does not review products, and it does not tell you which finish is in fashion.

All seventeen are posted, and nothing here was padded out to hit a word count. Three are start-here guides, one each on planning, cost and kitchens. Three more go deeper on the kitchen: what one costs, why the layout comes first, and how to tell whether a wall carries the floor or roof above it. Three more carry the cost question into the bathroom, the addition and the whole house. If the one you need is not covered, the phone is still faster than waiting for us to write it.

02The seventeen we have written

Every title here is a question we have already answered out loud on a job site.

All seventeen are live. Read the one that matches where your job is, or call, and you will get the same answer applied to your address.

01 · Planning, where to start

The Reno homeowner’s guide to planning a remodel

The order the decisions in a remodel come in: scope, a rough budget, how you hire, the contract, the permit and living in the house, with where each one is written up in full.

02 · Contractor records and contracts

How to verify a Nevada contractor licence before you sign

Where the Nevada State Contractors Board publishes its record, which fields on that record actually matter, and what the record still cannot tell you about the crew that will be in your house.

03 · Cost, where to start

What a remodel costs in Reno and Sparks

Where a kitchen, a bathroom or an addition starts in Reno and Sparks, why a whole home is priced from a walkthrough, the four things that set the number, and why no single price is printed on the page.

04 · Kitchens, where to start

The Reno homeowner’s guide to a kitchen remodel

The three decisions a kitchen turns on (the layout, whether a wall moves, and the budget), the order a kitchen gets built in, and the planning misses that cost the most to undo.

05 · Kitchens, what they cost

What a kitchen remodel costs in Reno and Sparks

Where a Reno or Sparks kitchen starts, why cabinets are usually the biggest line, and the three changes that move the number most: a wall, the plumbing and the finish level.

06 · Bathrooms, what they cost

What a bathroom remodel costs in Reno and Sparks

Where a Reno or Sparks bathroom starts by finish level, why a small room costs so much per square foot, and the three things that move the number: moving fixtures, what is behind the tile and the shower itself.

07 · Additions, what they cost

What a home addition costs in Reno and Sparks

Per square foot starting ranges by finish level, why a second storey starts from the same range as building out, how the lot decides which one fits, and the costs no square foot figure carries.

09 · Kitchens, the layout first

Settle the kitchen layout before anything else

Why the layout decides the plumbing, the gas, the walls and the budget before any finish is chosen, which moves are cheap and which are not, and how to test a layout with tape before you commit.

11 · Budgets, allowances, contingency

Where a Reno remodel budget actually goes, trade by trade

A walk through where the money lands, from demolition and structure to mechanical rough-in, the pipe and wire run inside the walls before they close, then cabinetry and finishes, and which line homeowners consistently price too low before the first wall comes down.

14 · Site life and phasing

How to live in the house during a remodel

Staying put while the house is open: dust containment, which rooms go offline and in what order, the stretch with no kitchen, and the choices that make that stretch shorter.

15 · How a remodel is bought

Design-build vs. bid-build for a Reno remodel

Two different ways to buy construction. Who holds the drawings, who carries the risk when the drawings turn out to be wrong, and which arrangement suits somebody doing this once.

17 · Value, appraisal and paperwork

Which remodels hold value in the Reno and Sparks market

Which parts of a remodel a local buyer registers and which ones only you will ever notice, written without national return-on-investment tables, because those are not written about this market.

03What these will not be

Four rules the writing has to clear before it goes up.

Rule one
No number without a sourceA figure with nothing behind it reads as authority and is worth less than an honest range. Where we cannot cite it, we describe the mechanism instead.
Rule two
No code paraphrased from memoryPermit and zoning guidance is quoted from the ordinance that governs that address, with the date it was read, or it is not written at all.
Rule three
No borrowed paragraphsEvery sentence is written for this site. Copy lifted from another business or a supplier’s blog is findable in a minute, and finding it tells you something.
Rule four
No product round-upsWhich window, which plank, which brand: that is somebody else’s subject. Ours starts at the contract and ends at the punch list.

04How an entry is built

Each one is laid out like a drawing sheet, not like an advertisement.

The study beside this text is the layout every entry follows: the claim at the top of the sheet, the working it out below it, and a title block at the bottom carrying the source, the jurisdiction it applies to and the date it was checked. If a paragraph cannot fill in that title block, the paragraph comes out.

That is a slower way to write, and it is why there are seventeen titles here instead of forty. It also means an entry can be argued with. You should be able to take any sentence in this library to a plan reviewer, a lender or another contractor and have them tell you whether it holds, which is the same standard the six phases a job runs through are written to.

  • SOURCE
  • JURISDICTION
  • DATE CHECKED
  • THE CLAIM
Layout study drawn for this page. It is a diagram of how an entry is set out, not a screenshot of one. The seventeen entries themselves are a click away, and a mocked-up screenshot standing in for them would be the first thing here that failed its own rule three.

05Read these in the meantime

Six pages that already answer most of what the library will cover.

01

How a job runs

The six phases, the document each one closes with, and where the money moves. Most of the contract questions land here.

02

What it is likely to cost

A planning range by room, size, finish tier and whether structure moves. The assumptions are printed rather than buried.

03

Our service lines

The service lines, and which one your project actually sits in when it involves more than one trade.

05

Paying over time

How a monthly-payment arrangement lines up against a draw schedule, and what to read before you accept one.

06

Who you would be hiring

How we are set up, what we run with our own people, and what we sublet. That last one is the question underneath most of the others.

06Start a conversation

If one of those seventeen entries is about the job you are planning, ask us now.

An article is written for everybody; your job is not. Tell us which one you read, and we will answer it on the phone for your address, your jurisdiction and your house, which is more useful than the general case.

Fastest way to reach us (775) 200-0648

Monday to Friday, 9:00 AM to 4:00 PM. A person answers, and it is somebody who has been on a job site. The form goes to the same place, one business day behind the phone.

Optional. The phone is the faster path. Email replies can take a business day.
The address or at least the city, what you are thinking of doing, and where you are in the process. That is enough for a real answer.

By clicking Send the question, you authorize Advanced Design & Development, Inc. (Nevada contractor license 0077896A), and no other company, to contact you at the telephone number and email address you entered above, by telephone call and email, including calls delivered using an automatic telephone dialing system or an artificial or prerecorded voice, about the project you are asking us about on adadremodel.com. You are not required to agree to this in order to buy any product or service from us. See our Privacy Policy and Terms and Conditions.