01
Scope as contracted
What the signed line-item scope actually covered, not a description written afterwards to match the photographs.
Nevada contractor license 0077896A · Advanced Design & Development, Inc.
Monday to Friday, 9:00 AM to 4:00 PM · 1155 Watson Way, Suite 7, Sparks, NV 89431
Partly. The photographs on this page are ours: our own jobs, shot on the site, some by a photographer we hired and some by us while the work was underway, and dated wherever the original file carries a date. The written project record that belongs under each one is not published yet, and this page says plainly which is which rather than letting a gallery imply the rest.
01Why there are no records yet
This website is new, and a new website has no published record. The industry answer to that is well known: buy a stock library, or crop a supplier’s marketing shot tightly enough that nobody asks. Both are easy to spot, and a homeowner who spots one has learned something true about how the rest of the paperwork will read.
So this page holds the shape of the record as well as the record. The photographs below are our own sites and our own crews, published with the owners’ permission and dated wherever the file allows; the eight-field record that belongs under each of them is written out in the next section and will be filled in as the jobs close out. A drawing labelled as a drawing still stands where a photograph has not been earned.
02What a project record will contain
A portfolio that only carries a photograph and a room name is an advertisement. These are the fields that make an entry checkable.
01
What the signed line-item scope actually covered, not a description written afterwards to match the photographs.
02
Which authority reviewed it, what was permitted, and which inspections the job carried from rough-in to final.
03
Whether walls moved, what was load-bearing, and what engineering the change needed. The part a photograph cannot show.
04
The order the trades ran in and where the handoffs sat: the same six-phase sequence, applied to a real house.
05
Calendar weeks from demolition to signed punch list, and how many of those were spent waiting on review or on a material.
06
How many were raised, and what triggered them: a concealed condition, an inspector, a selection over allowance, or a change of mind.
07
Before, during and after, shot on that site with the owner’s written permission. Nothing else will ever appear here.
08
One honest line per job. A portfolio without this field is a brochure, and everybody reading it already knows that.
03What will never appear here
04The first photographs
The plate beside this text used to be a plan study, a line drawing that admitted it was a drawing, holding this space until we had photographs of our own to put in it. It held that space for exactly as long as it needed to.
These are those photographs: our own jobs, shot for us on the dates written under each plate, and published with the homeowners’ permission. Five jobs appear on this page: a re‑side in the valley and a house above Lake Tahoe, both shot on 28 October 2025, then further down two bathrooms photographed while we built them, in 2021 and 2022, and a finished kitchen. A full project record (scope, numbers, and the one honest line about what we would do differently) takes longer to earn than a photograph, and the records will land here as they are written. The two checks that matter before anyone signs still stand: whether the estimate is specific, and whether the person on the phone can describe your job in the right order.
Four weeks of one bathroom, from the day the walls and ceiling came open to the week the glass went in. Each date is read from the original photograph.
Ten days on one floor in a different house: the old tile off, new tile set around a dark stone inset, then grouted and finished around the fixtures.
Three frames of one finished kitchen. These files reached us without a shoot date, so none is printed under them. We would rather leave the date off than guess it.
05What to look at instead
01
The six phases and the document each one ends in. A contractor who can describe the order is a contractor who has run the order.
02
A planning range for a Reno and Sparks remodel by room, size, finish tier and whether structure moves.
03
Long answers on contracts, draws, permits and living in the house while the work happens.
06Start a conversation
If a full portfolio is what you need before you can decide, say that on the call and we will tell you honestly which jobs are photographed, which are still open, and when the written records will be published here.
Monday to Friday, 9:00 AM to 4:00 PM. A person answers, and it is somebody who has been on a job site. The form goes to the same place, one business day behind the phone.
We will call you back within one business day to set the walkthrough. If you need us sooner than that, call (775) 200-0648 now (Monday to Friday, 9:00 AM to 4:00 PM).