01
Kitchens and baths
In site-built houses: new layouts, and the plumbing, wiring and walls that move with them.
Nevada contractor license 0077896A · Advanced Design & Development, Inc.
Monday to Friday, 9:00 AM to 4:00 PM · 1155 Watson Way, Suite 7, Sparks, NV 89431
Some homes here were built where they stand and others arrived on a chassis, and different agencies permit work on each. As a general contractor we remodel the first kind and build garages and other stand-alone structures.
01Two kinds of house
Sun Valley is unincorporated Washoe County (outside any city), and about half of its housing units are mobile or manufactured homes, with most of the rest detached single-family houses (Census Bureau, American Community Survey 2020 to 2024 estimates).
Work on a manufactured home itself goes to the Nevada Housing Division (Manufactured Housing). Its permit comes before anyone installs, rebuilds or adds to the home (NAC 489.411), and its approval before any room, garage or other addition entered directly from the home, or any change to the home’s structural, electrical, mechanical, roofing or plumbing system (NAC 489.486). Washoe County permits the ground around it: the site inspection, lot development, the gas, power and water lines, and any garage, carport or other structure placed on the lot. The state does every inspection inside the home.
A site-built house is simpler. The county asks for two checks first, that the parcel is unincorporated and what Planning says it allows, and we make both before anything is drawn. Then the permits come from the Washoe County Building Program at 1001 E. Ninth Street in Reno, whose counter is open Monday to Friday, 8:00 AM to 4:00 PM, with applications uploaded to www.onenv.us. Source: NAC 489.411 and 489.486, and Washoe County’s Building Program and Mobile and Manufactured Homes pages, read 10 November 2026.
02Attachments and the licence
In the state rules, to “attach” is to fasten a structure so it depends on the home for any part of its support (NAC 489.460 and 489.470). An awning or carport built for a live load (the weight it carries on top of its own) over 20 pounds per square foot may not be attached at all, apart from flashing that keeps water out of the joint; it stands on its own under local rules (NAC 489.475).
A business that installs or repairs a manufactured home’s awnings, roofing, skirting (the panels around its base), plumbing, heating or electrical systems, or rebuilds it by altering, adding or replacing substantial parts, is a general serviceperson (NRS 489.102), and unless it is exempt, doing or even bidding that work without a Housing Division licence is unlawful (NRS 489.311 and 489.806). If your project touches a manufactured home itself, tell us on the first call and we will say whether it is work we can bid. Source: NRS 489 and NAC 489, read 10 November 2026.
03Site-built houses, water and sewer
Across all housing units here, mobile homes included, the 1990s are the largest building decade, then the 1970s and the 1980s (Census Bureau, American Community Survey 2020 to 2024 estimates).
Inside its service area, the District’s tariff (its rulebook for service) requires a Washoe County permit for an accessory dwelling unit, or ADU (a second, self-contained home on the lot), and then the District’s will-serve letter, its written promise to supply the unit. The tariff counts an addition designed to be lived in separately, with at least a permanent kitchen and a toilet, as an attached ADU.
An attached unit’s water and sewer lines extend the house’s. A detached unit needs its own water service line, tap (a separate connection into the water main), meter and dedicated water rights (a legal right to a set amount of water, set aside for it), and its own sewer line and tap unless the District allows an extension case by case. A new water connection also carries a District facilities charge.
The District inspects that sewer work itself, built to its construction specifications (the Green Sheet), before a second unit is used, and its packet for new lots asks for a call before a sewer line is covered. Source: the District’s tariff, Rules No. 1, 20 and 21, and its single-lot packet, read 10 November 2026.
04Scope
01
In site-built houses: new layouts, and the plumbing, wiring and walls that move with them.
02
Rooms added onto a site-built house and joined to its roof and foundation.
03
Attached to a site-built house or detached, planned around the county permit, the will-serve letter and, if detached, its own water tap.
04
Garages, carports and other structures standing on their own. Beside a manufactured home: not fastened to it, not entered from it.
More on three of them: ADUs and garage conversions, home additions and kitchen remodeling.
05Permit, inspection, sign-off
The county runs a building permit in three phases: pre-submittal, plan submittal and review, and issuance. Since 1 January 2026 every submittal (the application and drawings sent for review) must meet the 2024 code editions. An application nobody pursues is abandoned 180 days after filing, and a building permit lapses 18 months after issue. Since 1 November 2026 an inspection request must be in by 3:30 PM to be considered for the next available inspection day, and no work that could cause a fire hazard may happen on Red Flag (fire-weather warning) days. Source: Washoe County Code 100.105 and the Building Program’s pages, read 10 November 2026.
We confirm the parcel and how the house was built, prepare and upload the drawings and application, answer review comments ourselves, request each county inspection before the cutoff and book each District inspection. On a manufactured home itself, the Division issues the permit, and its holder keeps it on site for the Division or the county to see on request (NAC 489.411).
06Questions
Contract and payment questions are answered on the home page; these three are local.
Under Nevada law, a home built on a permanent chassis to move in one or more sections is a manufactured home, foundation or not, if it meets a minimum size (NRS 489.113). That decides who permits the work: the Nevada Housing Division for an addition opening into it or a change to its structure or systems, Washoe County for a site-built house. Converting the home to real property (NRS 361.244) makes it part of the land, but no rule we have read moves its alterations away from the Division.
A room opening into a manufactured home needs the Nevada Housing Division’s approval first, and unless NRS 489 exempts the builder, building it takes the Division’s licence. Tell us on the first call and we will say whether it is work we can bid. A garage or other structure standing on its own on the lot, neither fastened to the home nor entered from it, is Washoe County’s to permit, and that we can take on.
A detached one does, inside the Sun Valley General Improvement District’s service area, along with its own service line, tap and dedicated water rights. An attached unit’s water line extends the main house’s instead. Source: the District’s tariff, Rule No. 20, read 10 November 2026.
07Start a conversation
Built on the lot or brought in on a chassis, attached or standing on its own: those two answers set the agency and the order of approvals, and one call settles both.
Monday to Friday, 9:00 AM to 4:00 PM. A person answers, and it is somebody who has been on a job site. The form goes to the same place, one business day behind the phone.
We will call you back within one business day to set the walkthrough. If you need us sooner than that, call (775) 200-0648 now, Monday to Friday, 9:00 AM to 4:00 PM.