01
Kitchens and baths
Cabinets, counters and tile need no permit; moving the sink, a gas line or a wall does, and we price it that way from the first visit.
Nevada contractor license 0077896A · Advanced Design & Development, Inc.
Monday to Friday, 9:00 AM to 4:00 PM · 1155 Watson Way, Suite 7, Sparks, NV 89431
The Census Bureau lists Spanish Springs as a census-designated place, not a city, so there is no town building department. As a general contractor we take on remodeling here: kitchens and baths, additions and whole-home renovation.
01County, not city
The Building Program issues building permits for unincorporated Washoe County, the parts of the county outside any city. Its office is at 1001 E. Ninth Street in Reno, (775) 328-2020, and the front counter is open Monday to Friday, 8:00 AM to 4:00 PM. Applications and drawings are uploaded to www.onenv.us, the online permit portal the county lists. Source: Washoe County Building Program pages, read 10 November 2026.
The first check is the parcel. The county’s Getting Started page asks owners to confirm the property really is unincorporated, since it may sit within the “sphere of influence” of Reno or Sparks: “The location of the property will determine which agency you will need to visit for permitting.” We check it on Quick Maps, the map the county links to, before any design starts.
The second is Planning: before the building permit, the county says to ask its Planning Division about the land rules on your parcel. For an addition or an ADU (a second, self-contained home on the lot) that answer shapes the drawings, so we get it first. Source: Washoe County’s Getting Started page, read 10 November 2026.
02A committee comes first
A lot can answer to a construction committee, a group that reviews building plans, as well as to the county. Washoe County’s Building Program publishes a 2025 HOA/Construction Committee Registration Affidavit and lists a Construction Committee Affidavit among its residential forms, and Nevada law has a section on it: NRS 278.566 is headed “Written report of construction committee required before building official may issue building permit”.
What those forms require, and how a given committee reviews plans, we confirm for your lot rather than guess.
So where a committee exists, its written report goes in first, the county application follows, and nothing is ordered until the report and the permit are both in hand. Source: NRS 278.566 and the Washoe County Building Program pages, read 10 November 2026.
03The houses
The share is from the Census Bureau, American Community Survey 2020 to 2024 estimates, which also put very few homes here before 1980 and almost all as single-family detached houses. A first big remodel of a house that age usually reaches the cabinets and counters, the tub or shower, the floors and lights, and sometimes a wall that has to move.
Washoe County Code puts those on two sides of a line. Exempt: “Painting, papering, tiling, carpeting, cabinets, counter tops and similar finish work”, a sink or toilet swapped without changing its pipes, and replacement light fixtures. Permit work: cutting away part of a wall, removing or cutting a beam or other support that carries weight, changing a required way out of the house, and adding, altering, replacing or moving pipes (a failed concealed one included), wiring or heating, cooling and ventilation work.
A door or window replaced in the same opening size and location can be exempt too, if it meets the adopted energy code, current safety glazing rules (glass made to break safely) and, for an escape window, the code in effect when the original window was installed; so can wood or composite siding over existing siding. We do those only inside a remodel. Source: Washoe County Code 100.105.2, read 10 November 2026.
04Scope
Scope means the work a contract covers. Here it comes in four kinds.
01
Cabinets, counters and tile need no permit; moving the sink, a gas line or a wall does, and we price it that way from the first visit.
02
An addition is permit work from the footing (the concrete base it stands on) up. The county’s guidance exempts a deck only at 200 square feet or less, 30 inches high or less, not serving the required exit door and meeting the setbacks, the required distances from property lines. A patio cover is not part of that exemption. Source: the county’s What Requires a Permit page, read 10 November 2026.
03
Both start with Planning and what the parcel allows; the application must then describe the work and the land, state the use and the work’s value, and carry the drawings (Washoe County Code 100.105.3).
04
Several rooms, the systems behind their walls and often the exterior, under one contract and one schedule.
More on three of these services: kitchen remodeling, bathroom remodeling and home additions.
05Permit, inspection, sign-off
The county’s permit process has three phases: pre-submittal, plan submittal and review, and issuance. On a Spanish Springs lot, pre-submittal (everything before the application and drawings go in) holds the parcel check, the Planning question and any committee report. Then we upload the submittal, answer the reviewers ourselves and book each inspection. When the final inspection passes, the approved drawings and the inspection record come to you.
Since 1 January 2026 every submittal has had to meet the 2024 codes, including the 2024 International Residential Code (the model code for houses) with the 2024 Northern Nevada Amendments. A plan drawn to the 2018 codes but never filed gets updated first; one filed under them before that date stays under them.
An application is treated as abandoned 180 days after filing unless pursued in good faith, and a building permit expires 18 months after issuance. Since 1 November 2026 an inspection request is considered for the next available day only if it is in by 3:30 PM, so ours go in early. No work that can cause a fire hazard is allowed on Red Flag days, the days a Red Flag Warning for fire weather is in effect. Source: Washoe County’s Getting Started, Adopted Building Codes and Building Program pages and County Code 100.105, read 10 November 2026.
06Questions
Contracts, payments and changes to the work are covered on the home page; these three are about permits.
For most Spanish Springs parcels it is the Washoe County Building Program, whatever city the mailing address names. A parcel can also sit within the sphere of influence of Reno or Sparks, so the county asks owners to confirm which agency permits theirs before applying. We look yours up before anything is drawn.
No. The committee’s written report and the county’s building permit are separate approvals, and one does not stand in for the other. NRS 278.566 is headed “Written report of construction committee required before building official may issue building permit”, so on a lot with a committee we get its report first and file the county application after it.
Not for finish work: Washoe County Code exempts painting, papering, tiling, carpeting, cabinets, counter tops and similar finish work. Moving a sink or a gas line, adding or moving wiring, cutting away part of a wall or cutting a structural beam is permit work. A new layout usually does at least one of those, so we tell you which side your plan is on before pricing it.
07Start a conversation
County or city, committee or none, exempt or permit: on a Spanish Springs house we answer those three before anything is priced.
Monday to Friday, 9:00 AM to 4:00 PM. A person answers, and it is somebody who has been on a job site. The form goes to the same place, one business day behind the phone.
We will call you back within one business day to set the walkthrough. If you need us sooner than that, call (775) 200-0648 now, Monday to Friday, 9:00 AM to 4:00 PM.