A Dayton addition or remodel that needs a permit goes to Lyon County; in the Central Lyon fire district, the district approves first.

In Dayton we build additions, remodel kitchens and baths, convert garages and renovate exteriors. As the general contractor we carry every approval the job needs, in the order the agencies set.

Jurisdiction
Lyon County Building Department, in Yerington
Applications
Citizen Portal online, or in person in Yerington
Comes first
Fire district approval, inside the Central Lyon County Fire Protection District
Talk to us
(775) 200-0648, Monday to Friday, 9:00 AM to 4:00 PM

01The county permit

Lyon County reviews permit work on a Dayton house, and its building counter is in Yerington.

Unless the adopted codes exempt the work, putting up, enlarging, altering, repairing, converting or demolishing a building takes a county permit (Lyon County Code 15.239.06). The county’s Building page lists one office, in Yerington, at (775) 463-6591, open Monday to Friday, 8:00 AM to 5:00 PM, with the counter closing at 4:00 PM. Applications go in through the county’s online Citizen Portal or at that counter, and a contractor may apply for the owner with the owner’s written authorization, which is how we file yours.

Plans submitted since 1 January 2026 must meet the 2024 codes the county commissioners adopted in August 2025, including the International Existing Building Code (written for work on buildings already standing), with two sets of local changes on top: the Northern Nevada amendments and the county’s own. The county’s current estimated review time, as of 10 November 2026, is 3 to 5 weeks, and we check it again before filing. Source: Lyon County Code 15.239, the county’s Building page and its Building FAQs, read 10 November 2026.

02Fire district first

Where the fire district covers a parcel, its approval comes before the county application.

The county’s permit FAQ says that “all properties within the Central Lyon Fire District must obtain approval from the Fire District prior to submitting a permit application to the Lyon County Building Department.” The Central Lyon County Fire Protection District has its office at 246 Dayton Valley Road, Suite 106, and lists Station 35, Dayton/Sutro.

The district also requires its own plan review (a check of the drawings) and permit for residential construction greater than 200 square feet, and the codes it lists include the 2024 International Fire Code and the 2024 International Wildland-Urban Interface Code, which governs building where houses meet open, burnable land. Its page does not say whether an interior remodel counts toward that figure. So we confirm whether the parcel is inside the district and, if it is, ask about your scope, the exact work you want done. Source: the county’s Building FAQs and the district’s own pages, read 10 November 2026.

03The county’s own rules

Lyon County’s amendments change how an addition, a kitchen island and a garage wall are built.

More than half of the homes inside Dayton’s census boundary were built between 1990 and 2009 (Census Bureau, American Community Survey 2020 to 2024 estimates). New work on one of them follows the 2024 codes, and the four rules below are the county’s own.

First, the seismic design category, the earthquake rating the framing is designed to: an addition drawn straight from the residential code’s tables goes to category D2 here, where the Northern Nevada amendments say D1. Any other design is engineered throughout to the 2024 International Building Code’s category D, and the two methods may not be mixed. Second, the frost line, the depth the ground can freeze to: the county sets its minimum at 18 inches below 5,000 feet of elevation and 24 inches at or above it, with water lines at least 12 inches deeper than that.

Third and fourth, inside the house: every kitchen island countertop needs receptacles (electrical outlets), and a provision for adding them later does not count in their place. A wall between a garage and living space, and the ceiling of an attached garage, take at least 5/8-inch Type X gypsum board, a fire-rated drywall, on the garage side. Source: Lyon County Code 15.239.02, read 10 November 2026.

The county’s FAQs name three jobs that need no building permit: a one-storey detached shed or playhouse of 200 square feet or less with no electrical, mechanical or plumbing work; a detached deck of 200 square feet or less, under 30 inches above the ground; and a fence 7 feet tall or less. Attached decks always need one. Source: Lyon County’s Building FAQs, read 10 November 2026.

Exterior work can need one more approval. State law has the Comstock Historic District Commission establish a historic district in parts of Storey and Lyon counties (NRS 384.100). Inside it, no structure may be built, altered, moved or demolished until the Commission or its staff approves a certificate of appropriateness, its written approval of the exterior (NRS 384.110). Where the county’s codes and the Comstock district’s requirements differ, the stricter one applies (Lyon County Code 15.239.01). The Commission’s staff confirm whether a parcel is inside, and we ask before any exterior change is drawn. Source: NRS chapter 384 and the Commission’s page, read 10 November 2026.

04Scope

This is the remodeling work we take on in Dayton.

01

Additions

Rooms and second storeys drawn to the county’s seismic and frost rules, with new heated or cooled space meeting the 2024 energy code.

02

Kitchens and baths

Island outlets wired to the county’s rule, and on Lyon County Utilities water, a check for the required pressure regulator.

03

Garage conversions and ADUs

Type X board wherever a garage still meets living space, and for an ADU (accessory dwelling unit: a second, smaller home on the lot) an early call to the utility serving the lot.

04

Exterior renovation

Rooflines, porches and decks, with the Comstock question answered before drawing starts.

More on three of them: home additions, kitchen remodeling and exterior renovation.

05Permit, inspection, sign-off

We file in the order the agencies set, and the inspector’s report and signed card showing final approval serve as your certificate of occupancy.

We prepare the drawings, get the district’s approval first where it applies, file with the county and answer review comments ourselves. A Lyon County permit becomes invalid if work does not start within 180 days of issue or stops for 180 days after it starts, unless the county extends it in writing, and we set the start date against that clock.

On a residential permit, the inspector’s report and the signed inspection record card showing final approval serve as the certificate of occupancy, the county’s record that the work may be used. In the Lyon County Utilities service area a building needs an approved pressure regulator with a strainer, holding incoming water to 80 psi (pounds per square inch) at most. The utility, at 34 Lakes Boulevard in Dayton, sets up new water or sewer service through its Water and Sewer Business Office. Source: Lyon County’s Building FAQs and Utilities pages, read 10 November 2026.

06Questions

Three questions Dayton homeowners ask.

The home page covers contracts and payment schedules. These three are about Dayton.

Lyon County’s Building Department. The application goes in through the county’s Citizen Portal or at its Yerington office, and a contractor may apply for you with your written authorization. If the property is inside the Central Lyon Fire District, the district has to approve the project before the county application goes in, so we confirm that first.

We will not guess that from an address. Part of the district lies in Lyon County, and the Comstock Historic District Commission’s staff confirm whether a property is inside it. If yours is, an exterior change needs the Commission’s certificate of appropriateness before work starts, as well as any county permit; the interior is not part of that review. We ask before any exterior change is drawn.

Yes if it is attached to the house, at any size. A detached deck of 200 square feet or less and under 30 inches above the ground is exempt from a building permit, but it still has to meet code.

07Start a conversation

Give us the address. We will confirm the fire district and the Comstock question before anything is drawn.

Two early answers shape the order of a Dayton job: whether the parcel is inside the Central Lyon fire district, and whether it is inside the Comstock Historic District. One call gets both moving.

Fastest way to reach us (775) 200-0648

Monday to Friday, 9:00 AM to 4:00 PM. A person answers, and it is somebody who has been on a job site. The form goes to the same place, one business day behind the phone.

Optional. The phone is the faster path, since email replies can take a business day.
Rooms, rough square footage, whether walls move, and when you would like to start. Detail here shortens the first call.
Optional. We ask because this site runs no tracking code.

By clicking Request a walkthrough, you authorize Advanced Design & Development, Inc. (Nevada contractor license 0077896A), and no other company, to contact you at the telephone number and email address you entered above, by telephone call and email, including calls delivered using an automatic telephone dialing system or an artificial or prerecorded voice, about the project you are asking us about on adadremodel.com. You are not required to agree to this in order to buy any product or service from us. See our Privacy Policy and Terms and Conditions.