Nevada contractor license 0077896A · Advanced Design & Development, Inc.

Monday to Friday, 9:00 AM to 4:00 PM · 1155 Watson Way, Suite 7, Sparks, NV 89431

(775) 200-0648

What a full-service contractor takes off your plate

Eight scopes, one contract, one schedule, and one company answering for the seams between trades, which is where remodels actually go wrong.

Scope
One bathroom through a whole-house renovation or a commercial build-out
Contract
One agreement, one draw schedule that ties payments to finished phases, one point of responsibility
Permits
Prepared, submitted and inspected by us, not handed back to you
Talk to us
(775) 200-0648, Monday to Friday, 9:00 AM to 4:00 PM

01What you are actually hiring

You are not hiring hands. You are hiring the order they work in.

A single-room remodel touches demolition, framing, plumbing, electrical, mechanical, insulation, drywall, tile, cabinetry, counters, paint and finish carpentry. Each is a separate company with a separate calendar, each waiting on somebody else’s work to be inspected before it can start. Hire them one at a time and you have not saved a general contractor’s fee. You have taken the general contractor’s job, without the phone numbers.

What we absorb is the connective tissue: a scope specific enough that two bidders are pricing the same house, long-lead material ordered against the schedule instead of against the demolition date, a permit set built in the format the reviewing counter wants, inspections booked so a passed rough-in, the sign-off on the plumbing and wiring inside the walls before they close, is followed by drywall that week, concealed conditions priced in writing before anyone repairs them, and a final draw held until the punch list is signed.

None of that shows up in a photograph of a finished kitchen. All of it is the difference between a twelve-week job and the same job in twenty-two weeks.

02One contract

Remodels fail at the seams, so we own the seams.

A seam is any place two trades meet and neither thinks the piece in between belongs to them: blocking for something mounted three weeks later, a duct that has to clear a beam not yet framed, a floor build-up that decides whether a door will swing. Under separate contracts a seam is an argument between two companies who each have a reason it is the other one’s problem, and the referee is the homeowner.

Under one contract it is ours. We hold the subcontracts and we sequence them, and when a handoff is missed the cost of fixing it sits on our side of the agreement rather than arriving on your invoice as somebody else’s extra. That is the whole argument for a general contractor, and it is worth exactly as much as the scope document underneath it.

03The service lines

Eight things we contract for, from one room to a whole building.

Different scopes, the same machinery underneath: written scope, drawn set, permit, schedule, draws tied to milestones, punch list, close-out.

01

Kitchen remodeling

Layout, then structure, then the trades: cabinets, counters, plumbing, gas, ventilation and tile in an order that does not double back.

02

Bathroom remodeling

Pan, curb, niche, drain, blocking and ventilation resolved on paper before anything is chosen for how it looks.

03

Whole-home renovation

Layout, structure, mechanical, finishes and exterior sequenced so the trades never queue behind each other.

04

Home additions

Rooms and second storeys tied into a foundation, roof line and mechanical system already standing and already carrying load.

05

ADUs and garage conversions

Designed to the rulebook the parcel sits under (city ordinance inside city limits, county code outside), confirmed first.

06

Outdoor living

Decks, patio covers and outdoor kitchens built as structures, with footings, attachment details and drainage, not as furniture.

07

Commercial tenant improvement

Build-outs for a landlord’s shell and a tenant’s deadline, staged around a building other people still occupy.

08

Exterior renovation

Roofline changes, porches, porticos and exterior stairs: the jobs that change the shape of the outside, not just its finish.

04What goes wrong

Four ways a multi-trade job goes sideways, and where the control sits.

The scope was a paragraph. A lump-sum bid that says “kitchen remodel” cannot be compared to anything or argued with later. Control: a line-item scope with named allowances, written before the contract is signed.

Material arrived after the trade did. Cabinetry, tile and specialty fixtures run on lead times that do not care about your start date. Control: long-lead items are pinned during selections, and the schedule is built backwards from them.

Something was found inside the wall. Rot, undersized framing, a drain that was never vented, wiring older than the current code cycle. Control: a written concealed-condition provision. The condition is photographed, priced, and signed before the repair.

Nobody owned the inspection calendar. A rough-in that passes on a Tuesday and gets closed up the following month is three weeks of nothing. Control: inspections are booked against the trade calendar, with the following trade already scheduled.

05Money mechanics

How the money is structured before anyone swings a hammer.

The scope document
Line items, not a lump sumEvery trade, allowance and exclusion written down, so you can see what a decision costs before you make it.
Draws
Attached to milestones you can look atPermit issued, framing complete, rough-in inspected, drywall closed, not dates on a calendar. The final draw is released after the punch list is signed.
Contingency
Set aside, not spentMost homeowners set aside another 10 to 15% for conditions found once work starts. Better held and never needed than met by surprise.
Change orders
Written, priced and signed firstA concealed condition, a scope change you ask for, an inspector requirement or a selection over allowance: each is priced as labour plus material plus a stated markup, and signed before the work.

We publish no prices here, because a number without a scope attached is not information. For a kitchen, a bathroom or an addition, the remodel cost calculator gives a planning range to budget against, shows its arithmetic and asks for nothing.

06Questions

Three questions worth asking any contractor.

Kitchen and bathroom sequencing is answered on those pages. These are about how the contract and the schedule work.

07Start a conversation

Tell us the scope. We will tell you what it touches.

The first conversation is not a sales call. It is us working out which trades your job actually needs, in what order, and what has to be decided before anything is ordered.

Fastest way to reach us (775) 200-0648

Monday to Friday, 9:00 AM to 4:00 PM. A person answers, and it is somebody who has been on a job site. The form goes to the same place, one business day behind the phone.

Optional. The phone is the faster path, since email replies can take a business day.
Rooms, rough square footage, whether walls move, and when you would like to start. Detail here shortens the first call.

By clicking Request a walkthrough, you authorize Advanced Design & Development, Inc. (Nevada contractor license 0077896A), and no other company, to contact you at the telephone number and email address you entered above, by telephone call and email, including calls delivered using an automatic telephone dialing system or an artificial or prerecorded voice, about the project you are asking us about on adadremodel.com. You are not required to agree to this in order to buy any product or service from us. See our Privacy Policy and Terms and Conditions.