Nevada contractor license 0077896A · Advanced Design & Development, Inc.

Monday to Friday, 9:00 AM to 4:00 PM · 1155 Watson Way, Suite 7, Sparks, NV 89431

(775) 200-0648

How Reno, Sparks and Washoe County each review an ADU

Three separate authorities, three separate ordinances, three separate counters. Which one reads your drawings is decided by the parcel, not by the city printed on your mail.

Published
6 October 2026
Subject
Planning and plan review
Numbers printed here
None, standards are read per parcel
Faster than reading
(775) 200-0648, Monday to Friday, 9:00 AM to 4:00 PM

01Who reviews you

Your mailing address does not decide who reads your drawings.

“Reno, NV” on an envelope covers three different review paths. If the parcel sits inside City of Reno limits, the City of Reno reviews it. Inside Sparks city limits, the City of Sparks does. Everywhere else in the valley (most of Verdi, Spanish Springs, Sun Valley, Washoe Valley and Incline Village), the parcel is unincorporated and Washoe County reviews it, from an office that itself carries a Reno street address.

This is not a technicality. The three bodies administer three different accessory dwelling unit ordinances. Unit size, the setbacks that say how far the building has to stand back from each property line, height, parking, where the entry may face, and the conditions attached to renting the finished unit are written separately in each document, and each is amended on its own timetable. Two parcels on opposite sides of one street can answer to different rules.

So settle the question before anything is drawn: a parcel number and the reviewing counter confirm it in one call. What follows is how the review proceeds, what differs between the three counters, and what the building side asks for wherever you are standing. What is deliberately absent is a table of setbacks and unit sizes. Section 03 says why.

02The review path

An ADU is reviewed twice: once as land use, then again as a building.

Most homeowners arrive expecting a single permit. The planning question is answered first: may this parcel have a second unit, of what size, where. That is the one that ends projects.

  1. 01

    Parcel feasibility

    Zoning district, parcel size, the existing lot coverage or share of the parcel the buildings already stand on, easements, water and sewer or septic, and whether the ordinance here allows an accessory unit at all. This is a planning conversation, and it happens before a designer is paid. You get a written feasibility note naming the sections it relies on

  2. 02

    Design to that ordinance

    The unit is drawn to the standards governing this parcel, not to a plan found online and not to what the neighbours built. Size, height, setbacks and the direction the front door faces are ordinance outputs, so the design starts from them. You get a site plan and floor plans dimensioned against the governing standards

  3. 03

    Discretionary approval, where it applies

    Some accessory units are approved administratively over the counter. Others need a discretionary approval, which can carry notice to neighbours, conditions attached to the decision, and a hearing calendar nobody on your side controls. You get an over-the-counter path confirmed, or a decision with its conditions listed

  4. 04

    Building submittal

    The permit set goes in through that jurisdiction’s portal with structural, energy and site documents attached. On many parcels it also triggers referrals: the health authority for septic, the fire district for access, the utility for a new service. You get a submitted application with a number you can follow

  5. 05

    Plan-review comments

    Almost every set comes back with comments the first time. That is normal and it is not a verdict. What matters is turnaround: answered in days rather than weeks, in writing, by the person who drew the sheet being commented on. You get the comment list and our written responses, both of them

  6. 06

    Issuance and inspections

    The permit issues, and the job is then governed by an inspection sequence rather than by a plan reviewer. Footings, framing, the rough-in where pipe and wire go in before anything is covered, insulation, final: each one a gate, scheduled around the trades rather than after them. You get an issued permit and an inspection record that closes out

03The three counters

Where you file, and why no setback figure is printed on this page.

Inside Reno city limits
City of Reno, Development ServicesPermit counter at 1 E. First St in downtown Reno, submittals through the onenv.us portal. The City administers its own accessory dwelling unit ordinance inside the city boundary.
Inside Sparks city limits
City of Sparks, Building and Safety431 Prater Way, counter open 9:00 to 4:00 Monday to Friday (the city’s Building Permits page, read 24 September 2026), submittals on the city’s Accela portal. Sparks has its own ordinance; a set assembled for Reno is not a set assembled for Sparks.
Unincorporated Washoe County
Community Services, Planning and Building1001 East 9th Street in Reno, portal onenv.us. The reviewing authority for most of Verdi, Spanish Springs, Sun Valley, Washoe Valley and Incline Village, despite the Reno address.
The standards themselves
Read per parcel, cited by sectionMaximum size, setbacks, height, parking, entry orientation and rental conditions differ between the three documents and are amended over time. For your parcel they are Reno Land Development Code 18.03.303 and 18.03.405, with parking at 18.04.708, inside Reno city limits, Sparks Municipal Code 20.03.003 inside Sparks, and Washoe County Development Code 110.306.20 and 110.306.25 on unincorporated Washoe parcels (all three read 30 July 2026), read against the current adopted text.

That last cell is a deliberate refusal, and it is worth explaining rather than hiding. A number that was correct when a page was written and wrong when it is read costs the writer nothing and costs the reader a redesign. So the standards live in a document that is dated and attributable instead of in body copy. Ask, and we will read the current figure for your address with you.

04What the reviewer reads first

The site plan decides more about an ADU than the floor plan does.

A planner reads the site plan first. Where the unit sits relative to each property line, how far it stands from the main house, what it does to lot coverage, which way its entry faces, and where a car can park once it exists: those decide whether an accessory dwelling unit is approvable at all. The interior layout is a building-code conversation and comes second.

The study beside this text is dimensioned with letters rather than numbers, because the letters are what the ordinance fills in and they differ between the three jurisdictions and again by zoning district. It is also why a garage conversion is not the shortcut it looks like: the building stops being a garage the moment it becomes a dwelling, and the parking it was providing has to be answered somewhere else on the same plan. Where that parking goes is settled early in how a garage conversion is actually built.

  • EXISTING HOUSE
  • PROPOSED ADU
  • PARKING
  • A
  • B
  • C
  • N
  • PROPERTY LINE · A B C PER ORDINANCE
Site-plan study drawn for this page. The dimensions are lettered on purpose: A, B and C are set by the ordinance governing the parcel, and printing plausible numbers here is the most expensive thing this page could do.

05Four shapes, four reviews

What you are building changes what the review is about.

Shape one
Detached, new constructionThe cleanest to design and the heaviest to permit: new foundation, new utility runs across the lot, its own envelope and structural set. Lot coverage is usually the constraint that sets the size.
Shape two
Attached to the houseAn addition that happens to be a separate dwelling. Structure and drainage have to reconcile with the existing house, and the review looks hard at separation, entry location and the shared wall.
Shape three
Garage conversionThe shell exists, which saves money and creates the hardest questions: whether slab and walls can carry a habitable assembly to the current energy code, where the mechanical equipment moves to, and what replaces the parking.
Shape four
Interior conversionCarving a unit out of the existing house: a basement, a wing, a floor. Least visible from the street, and often the most demanding on egress, fire separation, sound and a second way in.

06The building side

Six things the building department asks for whichever counter you are at.

01

The code edition in force

Washoe County adopted the 2024 International Residential, Energy Conservation and Wildland-Urban Interface Codes with the 2024 Northern Nevada Amendments. They took effect 1 July 2025 and have been mandatory for submittals since 1 January 2026; sets submitted earlier under the 2018 editions stay under them. Source: the county’s Adopted Building Codes page, read 24 September 2026.

02

Egress from every sleeping room

The International Residential Code requires an emergency escape and rescue opening of 5.7 square feet net clear (5.0 at grade-floor level), with at least 24 inches of clear height, 20 inches of clear width, and a sill no higher than 44 inches above the finished floor.

03

An envelope that meets the energy code

Walls, roof and slab edge insulated and air-sealed to the adopted edition, with the documentation to show it. On a conversion this is usually the line item nobody budgeted, because the existing shell was never built to hold heat.

04

Water, sewer or septic

Whether the unit shares the existing service or takes its own is part utility question and part code question. On a septic parcel it is a capacity question too, and that one is answered by the health authority rather than at the building counter.

05

Fire access, and wildland rules where they apply

Access width, turnarounds and water supply are referral items on many parcels. Where the wildland-urban interface code applies it reaches the exterior assemblies and the defensible space around the new unit as well.

06

Somewhere for the mechanical equipment

A furnace and water heater sitting in a garage cannot stay there once the garage is a dwelling. Finding a location, venting it and getting combustion air to it is real work with a real cost, priced in the job, not a detail to resolve on site.

07The neighbour’s unit

A finished ADU down the street is not a precedent for yours.

It is the most common thing a homeowner brings to a first meeting, and it is almost never usable. The parcel may sit in a different jurisdiction, if the boundary runs between you, or in a different zoning district on the same street. The permit may have been issued under an earlier version of the ordinance, or under the previous code edition. In unincorporated Washoe County, anything submitted before 1 January 2026 may have been reviewed against the older codes. It may have carried conditions invisible from the sidewalk. And some of what gets built is never permitted at all.

None of that means the answer is no. It means the answer comes from your parcel, read against the document that governs it, on the day you are asking. That is what a feasibility note is for, and it is the cheapest step in the project. If you plan to stay in the main house while the unit goes up, the practical side is in living in the house during a remodel; and when plan review asks for something the drawings did not show, the document that arrives is a change order, so read what has to be printed on one before you sign it.

08Questions

Three questions that come before an ADU is drawn.

09Keep going

Three pages that answer what usually comes next.

02

Living in the house while the work is going on

Dust containment, which rooms go offline and in what order, and the choices that make the worst stretch shorter. Containment and phasing matter most on an attached or interior unit.

03

What has to be printed on a change order

When plan review asks for something the drawings did not show, the document that arrives is a change order. What legitimately triggers one, and what has to be on it before you sign.

10Start a conversation

Give us the parcel number. We will tell you which counter reads your drawings.

That is a short call and it comes before everything else. Once the jurisdiction is settled we read the standards that actually govern the parcel, write them down with the sections they came from, and only then does anybody draw anything.

Fastest way to reach us (775) 200-0648

Monday to Friday, 9:00 AM to 4:00 PM. A person answers. The form goes to the same place, one business day behind the phone.

Optional. The phone is the faster path, since email replies can take a business day.
The address or the parcel number, roughly what you have in mind, and whether anything has been drawn yet. That is enough to tell you which document governs you.

By clicking Send the question, you authorize Advanced Design & Development, Inc. (Nevada contractor license 0077896A), and no other company, to contact you at the telephone number and email address you entered above, by telephone call and email, including calls delivered using an automatic telephone dialing system or an artificial or prerecorded voice, about the project you are asking us about on adadremodel.com. You are not required to agree to this in order to buy any product or service from us. See our Privacy Policy and Terms and Conditions.