Not a pie chart of somebody else’s projects. The order money is committed, what moves each trade line, and the places an estimate is usually too thin.
01Following the money
Search for a remodel budget breakdown and you are handed a pie chart: so much per cent to cabinetry, so much to labour, a wedge called “other”. Those charts are averages of other people’s projects, usually national, spread across house sizes and scopes that have nothing to do with each other.
We do not publish one, and the reason is not coyness. A percentage split is a statistic, and we have not measured one for the Reno and Sparks market. Printing a figure that looks measured when it is not is the commonest way a contractor’s website misleads without ever lying. What transfers is the mechanism: which trades take money, in what order, what moves each of them, and where an estimate is usually too thin. How the total itself is set, and the range a kitchen, a bathroom or an addition starts from here, is covered in what a remodel costs in Reno and Sparks; this page is about how that total divides. If you want a figure to plan around, the cost calculator gives a planning range with its assumptions printed on the page.
A remodel budget is not a pie. It is a sequence of commitments, each of which forecloses some of the ones after it. Knowing where you are in that sequence tells you what is still cheap to change.
Design and drawing time, structural engineering wherever load moves, permit fees, and any investigation the jurisdiction wants. Small against the whole and disproportionately powerful, because this is the only stage where changing your mind costs an eraser rather than a trade day.
Demolition, protection, containment and disposal, and the first honest look at framing, wiring, drain lines and any water that has been somewhere it should not. Your estimate assumed the conditions visible at the walkthrough; this is the week those assumptions get tested, which is why a written change-order process, meaning any change to the work or the price is signed before it happens, matters more than the low bid that skipped it.
Framing, headers, point loads, the spots where the weight of the house lands on a single post rather than spreading along a wall, then plumbing, electrical and mechanical inside open walls, then insulation and air sealing. Most of the money you will never see again leaves here, and the inspection sequence sits on top of it: one missed inspection costs a week of everybody’s time.
Drywall, waterproofing and tile, cabinetry, flooring, paint, trim, fixtures and appliances, then the punch list. Homeowners usually price this stage accurately in their heads, because it is the part that is shoppable.
The useful question about a trade line is not “how much” but “what moves it”. These are the levers.
An allowance is a placeholder: a sum carried in the contract for something you have not chosen yet. They are legitimate and unavoidable early on. They are also the easiest way to make a bid look competitive, because a thin allowance lowers the total today and raises it later, and the total is what people compare.
Three rules make them behave. Every allowance names what it covers and what it excludes, particularly whether labour is inside it. Every allowance carries a value you can go shopping against, so ten minutes at a supplier tells you whether it is real. And every allowance closes on a date, because an open selection is a schedule risk dressed as a decision. When one is exceeded, the difference is handled by a written change order.
Some of a budget is national: a sheet of drywall costs what it costs. Four things are local.
Three jurisdictions, three counters. Depending on the parcel, your project is reviewed by the City of Reno, the City of Sparks, or unincorporated Washoe County. Each runs its own process and its own fee schedule, and fees are typically calculated from a valuation of the work rather than charged flat. Review time is not a fee, but time on a construction schedule is money.
The code edition in force. Washoe County adopted the 2024 International Residential and Energy Conservation Codes with the 2024 Northern Nevada Amendments, mandatory for submittals since 1 January 2026 (the county’s Adopted Building Codes page, read 24 September 2026). Insulation, air sealing, glazing and mechanical work are priced against that edition, not against whatever the house was built to in its own decade.
Anything that moves load wants a calculation. On the older stock around central Reno and Sparks the wall you want gone is frequently doing something, and the stamped drawing proving what replaces it is a line, not a rounding.
Distance and season. Verdi, Washoe Valley and Incline Village add mobilisation, and winter access to a mountain parcel is a scheduling constraint with a price on it. Where we work sets out who reviews which address.
Every remodel of an existing house contains unknowns, and the honest way to carry them is a named contingency you hold and you release. A contingency buried inside the contractor’s number is margin with a friendly name, and it is spent whether or not anything is found. Hold it separately, decide in advance what it may be used for, concealed conditions and code-required work rather than upgrades, and require the same written change order to draw on it. If nothing is found it is still yours, which is the point.
Most bid comparisons are unfair, not because anybody cheated, but because the two documents describe different jobs. Eight questions make them comparable.
If a bid is materially lower and the reason is not in those eight answers, the reason still exists. It is somewhere you have not looked yet.
02What actually protects it
Almost every overrun we are asked to look at was a scheduling failure before it was a money failure. These four habits are what a general contractor is being paid for, and they cost nothing to ask for.
Tile, cabinetry, fixtures and appliances confirmed with model numbers before the first wall opens. A selection made mid-job is not a late decision, it is a rough-in dimension nobody had. You get a dated selections list with model numbers
Trades that arrive in the wrong order either wait, which you pay for, or work over each other, which you pay for twice. Sequencing costs money when it is missing, not when it is present. You get a dated schedule with the inspection points on it
Payments tied to stages of construction, as NRS 624.970(2)(k) requires, so the money released stays behind the work performed. A draw you can verify from the doorway is the simplest budget control there is. You get a draw schedule tied to visible milestones
Anything altering scope or price becomes a written change order before the work happens. The alternative is a running verbal tally both parties remember differently in month four, which is where budgets actually die. You get a signed change order before changed work starts
03The document
The number at the bottom of a proposal is the least informative thing on it. What tells you whether a budget will hold is the structure above it, which is the layout drawn beside this: a line for each scope item, a column saying what is included, a column saying what is not, a column carrying allowances, and a separate line for the contingency, outside the total, because it is yours.
Read left to right and the questions ask themselves. Anything with no line has not been priced; anything in the excluded column is a cost you are carrying whether or not you noticed; and any allowance you cannot shop against today is a number somebody hopes you will not test.
04Questions
Enough that something found behind a wall is a decision rather than a crisis, and held in your own account rather than inside the contractor’s number. We do not print a percentage, because a percentage is a statistic and we have not measured one for Reno and Sparks. What matters more than the size is the rules you set on it: decide in advance that it covers concealed conditions and code-required work rather than upgrades, and require the same written change order to draw on it. If nothing is found, the money is still yours.
Three things, and the first settles most arguments: an allowance names what it covers and what it excludes, particularly whether labour is inside the figure or only the material. It also carries a value you can go shopping against, so ten minutes at a supplier tells you whether it is real. And it closes on a date, because an open selection is a schedule risk dressed as a decision. When an allowance is exceeded, the difference is handled by a written change order rather than absorbed quietly.
Because we have not measured one. A percentage split is a statistic, and the ones you find online are averages of other people’s projects, usually national, spread across house sizes and scopes that have nothing to do with each other. Printing a figure that looks measured when it is not is the quiet way a contractor’s website misleads without ever lying. What does transfer is the mechanism: which trades take money, in what order, and what moves each line, which is what the rest of this page sets out.
06Start a conversation
A walkthrough, a written scope with the exclusions listed, and allowances you can test at a supplier before you sign anything. If the honest answer is that your budget and your scope do not meet, you will hear it at the kitchen counter rather than in month three.