Nevada contractor license 0077896A · Advanced Design & Development, Inc.

Monday to Friday, 9:00 AM to 4:00 PM · 1155 Watson Way, Suite 7, Sparks, NV 89431

(775) 200-0648

What a kitchen remodel costs in Reno and Sparks

A kitchen does not have a price. It has a range, and where you land is mostly decided by three things: whether the layout moves, what goes in the cabinets, and how far the finishes climb. Here is the honest range for here, what drives it, and how to size it to your own kitchen.

Published
6 October 2026
Subject
Kitchen remodel cost in Reno and Sparks
Prices printed here
None, starting ranges only
Faster than reading
(775) 200-0648, Monday to Friday, 9:00 AM to 4:00 PM

01The range

A standard Reno kitchen starts around twenty thousand and climbs with the finish and the layout.

For a standard kitchen of about 150 square feet, a refresh that keeps the layout, with stock or refaced cabinets and new counters, starts around twenty thousand and can reach the low fifties. A mid level of finish, with new semi-custom cabinets, counters and appliances, runs from about forty thousand to a hundred thousand. A full gut with custom finishes starts about where a refresh tops out and runs to around one hundred forty thousand, and moving a wall or relocating the sink and range adds to that. A small galley kitchen sits under those numbers, and a large open kitchen sits well over them. These are our own Reno and Sparks numbers, not a national average, and they are a starting range, not a quote. Your kitchen decides your number.

If you want the range for your own room, the remodel cost calculator takes the size of the kitchen, the finish level, the age of the house and whether walls, plumbing or wiring move, and returns a Reno and Sparks starting range in about two minutes. It is a starting point, not a quote, because a real number waits on someone seeing the space. Where a kitchen sits beside a bathroom and an addition, why a whole home is priced from a walkthrough, and why no single price is printed for any of them, is set out in what a remodel costs in Reno and Sparks.

02Where it goes

In a kitchen, the money has a pecking order.

Cabinets are almost always the biggest single line, which surprises people who expected it to be the appliances. Countertops come next, then appliances, then the labor to install all of it. Everything else (backsplash, hardware, paint) is real money but rarely the thing that moves the total. If you want to control a kitchen budget, you control the cabinets first.

Remodeled kitchen with white shaker cabinets, a farmhouse sink, dark large-format floor tile and a cushioned window seat
One of our finished kitchens. In a room like this, the cabinet run is most of what you see.
Galley kitchen with white shaker cabinets and a dark tile floor, opening through a wide doorway to the dining room
The same kitchen’s galley, with cabinets on both walls.

03The multipliers

Three things move your number more than any single finish.

Moving a wall, if it turns out to be structural, adds a beam, engineering and a permit. Whether that wall is load-bearing, which means it carries the weight of the floor or roof above it, is worth knowing before you budget. Moving the plumbing or gas (relocating the sink or the range) means opening the floor and re-running lines. And the finish level (stock or custom cabinets, laminate or stone) can double a number without changing the layout at all.

The layout decision is where most of these get set, which is why the Reno guide to a kitchen remodel settles the layout before anything else gets chosen.

04The gap

An online estimate usually comes in lower because it priced a different kitchen.

Almost always, the online number priced a smaller job, or a national median that never saw Reno, or it left out the wall and the plumbing that your kitchen actually needs. Line the two up item by item and the difference is the work that is really in each number, not the markup.

That comparison only works when both numbers are itemized, which is why the contract in our kitchen remodeling process carries a line-item scope rather than one lump figure.

05Questions

Three questions we get about kitchen cost.

06Keep going

Three pages that take the kitchen cost question further.

01

What a remodel costs in Reno and Sparks

Where a kitchen starts beside a bathroom and an addition, why a whole home waits for a walkthrough, and why no single price is printed for any of them.

07Start a conversation

Want a real number for your kitchen? We will walk it with you.

The ranges on this page are where a kitchen starts. A number for yours comes from seeing it: the layout, what is behind the walls, the age of the house. Send us the space and the address and we will set up a walkthrough.

Fastest way to reach us (775) 200-0648

Monday to Friday, 9:00 AM to 4:00 PM. A person answers. The form goes to the same place, one business day behind the phone.

Optional. The phone is the faster path, since email replies can take a business day.
The address or at least the city, the rooms involved, and anything you already know about the house, such as roughly when it was built. That is enough to set up a walkthrough.

By clicking Request a walkthrough, you authorize Advanced Design & Development, Inc. (Nevada contractor license 0077896A), and no other company, to contact you at the telephone number and email address you entered above, by telephone call and email, including calls delivered using an automatic telephone dialing system or an artificial or prerecorded voice, about the project you are asking us about on adadremodel.com. You are not required to agree to this in order to buy any product or service from us. See our Privacy Policy and Terms and Conditions.