Nevada contractor license 0077896A · Advanced Design & Development, Inc.

Monday to Friday, 9:00 AM to 4:00 PM · 1155 Watson Way, Suite 7, Sparks, NV 89431

(775) 200-0648

What a bathroom remodel costs in Reno and Sparks

A bathroom is the smallest room most people remodel and the one with the most going on per square foot. Here is the honest starting range for here, why a small room costs what it does, and the three things that move your number most.

Published
6 October 2026
Subject
Bathroom remodel cost in Reno and Sparks
Prices printed here
None, starting ranges only
Faster than reading
(775) 200-0648, Monday to Friday, 9:00 AM to 4:00 PM

01The range

A Reno bathroom starts in the mid single thousands and climbs with every fixture that moves.

For a full bath of about 50 square feet, a refresh (new fixtures, a new vanity, new tile and paint, with everything staying where it is) starts in the high single thousands and reaches into the low teens. A mid level of finish, with new tile throughout, a custom vanity and a glass shower enclosure, runs from the mid teens into the high twenties. A high finish, with custom tile and stone, a freestanding tub, a heated floor and fixtures in new places, starts around twenty thousand and runs into the high thirties. A powder room of about 25 square feet sits under those numbers, and a primary suite of about 110 square feet sits well over them.

These are Reno and Sparks ranges from our own pricing, not published figures or a national average, and every one of them is a starting range, not a quote. If you want the range for your own room, the remodel cost calculator takes the size of the bathroom, the finish level and the age of the house and returns a Reno and Sparks starting range in about two minutes. Where a bathroom sits beside a kitchen and an addition, why a whole home is priced from a walkthrough, and why no single price is printed for any of them, is set out in what a remodel costs in Reno and Sparks.

02Per square foot

A bathroom packs more trades into each square foot than any other room in the house.

In 50 square feet you can have a plumber, an electrician, a framer, a waterproofing installer, a tile setter, a glass company and a painter, each needing their own visit and their own inspection where one applies. The fixed part of the job (protecting the house, demolition, getting each trade to the door) does not shrink with the room, so it is spread over very few square feet.

That is why a bathroom twice the size does not cost twice as much, and why a small bathroom is rarely a small number. What changes inside the room matters as much as its size.

Bathroom opened up for a remodel: ceiling and walls cut back to the framing, wiring pulled down, subfloor bare
4 May 2022, one of our bathrooms opened up: framing, wiring, drains and subfloor all exposed, and each one a trade with its own visit.
Bathroom near completion with a walk-in shower behind a glass panel, a wooden soaking tub and two wood-topped vanities
31 May 2022, the same room four weeks later, with tile, glass, plumbing fixtures and both vanities in.

03The multipliers

Three things move a bathroom number more than the tile you pick.

The first is whether fixtures move. A toilet, a shower or a tub drains into a pipe that is already in the floor, and on a house built on a concrete slab, moving that drain means cutting the slab. Keeping each fixture where it is, even while everything around it changes, is the simplest way to keep a bathroom number down.

The second is what is behind the tile. A bathroom opened up in an older Reno or Sparks house can show old supply lines, a soft subfloor (the layer of boards the finished floor sits on) or a fan that was never vented outside. The calculator adds an allowance for houses built before 1990, and a larger one for houses built before 1980, because those are the walls that most often hold something.

The third is the shower itself. Turning a tub into a walk-in shower in the same footprint is a common, contained job. A curbless shower, where the floor runs straight in with no step, means lowering or reshaping the floor so the water still runs to the drain, and that is a different job and a different number.

04The part you cannot see

The most important layer in a bathroom is the one you will never see.

Every tiled shower sits on a waterproofing system: a membrane under the tile, a floor sloped to the drain, and a sealed detail where the shower meets the curb and the walls. Tile and grout are not waterproof on their own. When that layer is done well nobody ever thinks about it again, and when it is skipped or done thinly the first sign is usually a stain on the ceiling below, years later.

It is also the line most easily left vague in a proposal, because it is buried by the end of the week. When you compare two bathroom numbers, ask what each one includes under the tile, by name. How a whole budget breaks down by trade, and where estimates are most often too thin, is in where a remodel budget actually goes.

The written list of work we price a bathroom against, line by line, is set out in our bathroom remodeling work.

05Questions

Three questions we get about bathroom cost.

06Keep going

Three pages that take the bathroom cost question further.

01

What a remodel costs in Reno and Sparks

Where a bathroom starts beside a kitchen and an addition, why a whole home waits for a walkthrough, and why no single price is printed for any of them.

03

What a fair change order looks like

A change order is the signed page that changes the price before extra work starts: what it covers when the wall behind the tile shows something nobody could see at the walkthrough.

07Start a conversation

Want a real number for your bathroom? We will walk it with you.

The ranges on this page are where a bathroom starts. A number for yours comes from seeing it: what moves, what is behind the tile, the age of the house. Send us the room and the address and we will set up a walkthrough.

Fastest way to reach us (775) 200-0648

Monday to Friday, 9:00 AM to 4:00 PM. A person answers. The form goes to the same place, one business day behind the phone.

Optional. The phone is the faster path, since email replies can take a business day.
The address or at least the city, the rooms involved, and anything you already know about the house, such as roughly when it was built. That is enough to set up a walkthrough.

By clicking Request a walkthrough, you authorize Advanced Design & Development, Inc. (Nevada contractor license 0077896A), and no other company, to contact you at the telephone number and email address you entered above, by telephone call and email, including calls delivered using an automatic telephone dialing system or an artificial or prerecorded voice, about the project you are asking us about on adadremodel.com. You are not required to agree to this in order to buy any product or service from us. See our Privacy Policy and Terms and Conditions.