Nevada contractor license 0077896A · Advanced Design & Development, Inc.

Monday to Friday, 9:00 AM to 4:00 PM · 1155 Watson Way, Suite 7, Sparks, NV 89431

(775) 200-0648

The Reno homeowner’s guide to a bathroom remodel

A bathroom puts every trade in the house, and more water than any other room, into a few dozen square feet. That is why it rewards planning and punishes guessing. This guide covers the three choices that set a bathroom, the order the room is built in, and the misses that cost the most to undo.

Published
19 November 2026
Written by
Advanced Design And Development
Subject
The three decisions a bathroom turns on
Applies to
Reno, Sparks, Washoe County
Faster than reading
(775) 200-0648, Monday to Friday, 9:00 AM to 4:00 PM

01Why it is hard

Nothing in a bathroom has room to be wrong.

Plumbing, electrical, ventilation, waterproofing, tile and finish carpentry all share a space the size of a closet. It is also the one room built to get wet on purpose, which makes the layer that keeps water out of the framing (the wood structure inside the walls and floor) matter more than anything you can see. Most bathroom regret is not the tile color. It is a fixture that should have stayed put, or a shower tiled over a pan (the sloped base under the shower floor) that was never going to hold.

02The three that matter

Three decisions set the project. The rest is selection.

Whether the fixtures move, how the shower is waterproofed, and how the room is vented. Settle those three and the vanity and the tile are just shopping. Miss one and it comes back as a leak, a mildew problem, or a drain you pay to move twice.

How a shower is actually waterproofed is the decision that fails out of sight, so it is worth understanding before you pick a single tile.

And what a bathroom costs here is set mostly by whether the toilet, the sink and the shower stay where they are. For a full bath of about 50 square feet, a refresh that keeps every fixture in place starts in the high single thousands and reaches into the low teens here. Treat that as a starting range rather than a quote: the remodel cost calculator sizes one to your own room.

03The sequence

There is a point in a bathroom remodel you cannot come back from.

The rough-in goes in first: the water supply and drain lines that live inside the walls and floor. Then the waterproofing: the pan, and the membrane (a continuous waterproof sheet or coating) that turns the wet area into a sealed basin. Once tile goes on over that membrane, the waterproofing is a fact nobody can inspect again without demolition. If the pan was built wrong, you find out a year of showers later, usually from the ceiling below. That is why the order is not negotiable, and why a contractor who photographs the pan before tiling is telling you something about how they work.

Two of our own bathroom jobs are in the gallery, photographed while the work was underway.

04What goes wrong

The bathroom mistakes we see most in Reno are all decided before the tile goes on.

Tile set over a pan formed on site from mortar with no real membrane under it, so the waterproof layer is the grout, which is not waterproof. A bath fan ducted into the attic instead of outside, so the moisture pulled out of the room condenses on the underside of the roof. A toilet moved a few feet as an afterthought once demolition was done, which means rerouting a drain that has to keep its slope, and on a slab house cutting the concrete: one of the quiet budget movers in a small room. Every one of these is a planning or sequence miss, not bad luck, which means all of them are avoidable on paper.

Hiring, the contract, the permit and a few weeks with one bathroom fewer work the same way in every remodel, so they live in the guide to planning a remodel rather than here. Our own order of work, seven phases and what you hold at the end of each, is set out in how we run a bathroom remodel.

05Questions

Three questions we get about bathrooms.

A straightforward refresh in the same footprint is often two to three weeks of work. A full gut, especially one that moves plumbing or builds a curbless shower (one you walk into with no step at the entry), runs longer once you count waterproofing cure times, tile and inspections. The tile and the waterproofing are slow on purpose: rushing either one is how the expensive failures happen.

Often yes, but it depends on the floor. A curbless shower needs the drain and the slope built into the floor structure, which can mean recessing the joists (the framing boards that carry the floor) or building up the rest of the floor to match. It is a framing and waterproofing decision before it is a design one, so ask early rather than after the floor is closed.

Because the toilet is drainage, and drainage runs in the floor at a required slope. Moving it means opening the floor, rerunning the drain to keep that slope, and closing the floor back up. Keeping the toilet and shower drains where they are is one of the biggest quiet savings in a bathroom.

06Keep going

Three pages that take the bathroom decisions further.

07Start a conversation

Thinking about your bathroom? Start with what moves and what stays.

Tell us which bathroom and where the house is. We will look at what can stay where it is, how the shower will be built and where your number is likely to land, all before anything is ordered.

Fastest way to reach us (775) 200-0648

Monday to Friday, 9:00 AM to 4:00 PM. A person answers. The form goes to the same place, one business day behind the phone.

Optional. The phone is the faster path, since email replies can take a business day.
The address or at least the city, the rooms involved, and anything you already know about the house, such as roughly when it was built. That is enough to set up a walkthrough.
Optional. We ask because this site runs no tracking code.

By clicking Request a walkthrough, you authorize Advanced Design & Development, Inc. (Nevada contractor license 0077896A), and no other company, to contact you at the telephone number and email address you entered above, by telephone call and email, including calls delivered using an automatic telephone dialing system or an artificial or prerecorded voice, about the project you are asking us about on adadremodel.com. You are not required to agree to this in order to buy any product or service from us. See our Privacy Policy and Terms and Conditions.